Grid power recovery for data centers

Centralized medium-voltage GridBrake® solution for Post-Fault Active Power Recovery (PFAPR), developed for your facility’s recovery requirement and critical-power architecture.

  1. Grid connection
  2. Data center demand
  3. Controllable load

IT continuity is not the same as grid recovery

UPS systems can keep critical IT loads running during a grid disturbance, but the data center's power demand may not recover quickly enough after grid voltage returns. This can create a compliance challenge even when IT services remain unaffected.

Solve grid compliance without excessive battery storage

Exaum GridBrake temporarily adds controllable electrical demand through a dedicated medium-voltage feeder. As the data center's normal consumption returns, GridBrake reduces its load.

This supports Post-Fault Active Power Recovery (PFAPR) without the need to store energy. Where batteries are not otherwise required, GridBrake can offer a lower-cost alternative to BESS-based solutions.

Exaum provides the equipment, integration engineering and ongoing maintenance support.

Recovery sequence

  1. Voltage recovers
  2. Native demand remains below target
  3. GridBrake® adds demand
  4. Native demand returns; GridBrake® reduces load

What Exaum delivers

From GridBrake hardware to a complete, maintainable PFAPR solution.

GridBrake equipment

Modular, continuous-duty resistive loads with local control, designed for integration into medium-voltage electrical systems.

PFAPR engineering

System sizing, recovery control design and integration support, coordinated with the facility's UPS, protection and electrical systems.

Lifecycle support

Monitoring, preventive maintenance, spare parts and service arrangements to help keep the required recovery capacity available throughout the facility's operation.

Integrated into your existing electrical system

GridBrake connects through a dedicated, protected medium-voltage feeder alongside the data center's UPS and other electrical loads. It supports grid-side power recovery without replacing the UPS or standby generation.

The recovery controls are designed to work with the facility's protection and operating systems. The final connection and control interfaces are defined for each project.

From requirements to a working solution

Exaum works with your electrical design team to specify, integrate and verify the GridBrake solution for your facility.

  1. Define the requirements

    Review the applicable grid requirements and determine the active-power recovery needed at the connection point.

  2. Design the solution

    Size the GridBrake system and define the electrical connection, local controls and interfaces with the facility.

  3. Integrate and verify

    Coordinate installation and testing with the project team. Verify the GridBrake response as part of the facility's overall PFAPR assessment.

  4. Maintain availability

    Keep the required recovery capacity available through monitoring, preventive maintenance and agreed service arrangements.

Discuss your grid-side compliance requirement

Bring the operating scenario into the conversation.

Start a technical discussion